Latitude 44 Construction Update

IMG_0725

Wow we really have come along way so far this year. We are in the final phase of construction! The final building, building #9 is really starting to come along!

IMG_0727

The entire building has been framed up, trusses set, and sheeting for the roof has just been installed. Front sidewalks will be poured very soon. Shingles and siding are the next big step as far as exterior work goes. Then onto the inside.

 

 

IMG_0726

Inside work work starts with rough-ins. Electrical, plumbing, and HVAC rough-ins need to be done before the entire building can be insulated. Once insulation has been put up it is time for windows, exterior doors, and drywall. Drywall is then covered with plaster. With the cool, dry, fall weather plaster can be dry and ready to be painted in just a couple days! The painters cover all windows and exterior doors before spraying out the entire unit. Sprayed on paint speeds up the painting process drastically in comparison to rolling it on and provides better coverage on the textured walls.

 

IMG_0728

Once painting has been completed. We can start installing the flooring. During flooring installation we are also able to start the finish carpentry. Finish carpentry consists of trim, installing cabinets, and hanging doors. Once the finish work has been completed we will install the appliances, clean, and welcome in our new tenants!the flooring can be installed.

Building #9 is set to be completed by the end of 2014 and we will be welcoming in the new residents on January 1, 2015! If you are interested in joining us at Latitude 44 be sure to reserve your NEW home now. Only 4 units remain!